Troubleshooting
Trips, failed starts, module faults, CPU switchovers. Datalogs first, then the wiring, then the parts, so the unit is back without guesswork.
Telic Engineering / Controls / Woodward MicroNet
Unit tripped, outage coming up, or a NetCon that nobody wants to touch any more? We work on Woodward MicroNet, MicroNet Plus and MicroNet TMR, on LM2500, LM5000, LM6000 and TM2500 packages and on steam turbine and compressor trains, offshore and onshore. We read the GAP application and the datalogs before we touch anything, and we leave paperwork you can use.
The six places where most of our work happens, numbered as in the drawing at the top of the page.
By engineers who have done it before. Every job comes with a short daily report and paperwork you can use.
Trips, failed starts, module faults, CPU switchovers. Datalogs first, then the wiring, then the parts, so the unit is back without guesswork.
The controls and instrumentation scope of 4k, 8k, annual and L1 inspections on MicroNet units, done in the outage window, with calibration sheets and a service report before we leave.
Off the obsolete hardware without extending the outage: migrations from NetCon 5000 and Atlas to MicroNet and MicroNet Plus, commissioned on a running asset within the shutdown window.
Logic and sequence changes, alarm and trip settings, HMI updates. Tested offline, downloaded at an agreed moment, and documented, so the next engineer knows what was changed.
New MicroNet systems on gas turbine, steam turbine and compressor packages: I/O checks, functional tests, first start and load tests.
A day on the running unit: redundancy, power supplies, module diagnostics, alarms and the application version against what is on file. Written up, so you know what to fix at the next outage.
What we have actually worked on. If your system is not on it, ask.
| Period | Work | Equipment | Systems | Location |
|---|---|---|---|---|
| Jun–Aug 2026 | Commissioning, power management | Turbine generator, PMS | MicroNet/GAP, Flex500, easYgen, LS-6 | Egypt |
| Mar–Apr 2026 | 8k inspection, safety-critical instrumentation | 1× gas turbine | LM5000, MicroNet | Offshore UK |
| Feb–Mar 2026 | Annual inspections, functional checks | 2× gas turbines | LM6000, MicroNet | Offshore UK, FPSO |
| Jan–Feb 2026 | Annual inspections, functional checks | 2× gas turbines | LM6000, MicroNet | Offshore UK, FPSO |
| Jan–Feb 2026 | Annual inspections, DLE mapping | 1× gas turbine | LM2500 DLE, MicroNet | UK |
| Dec 2025 | 8k and safety-critical instrumentation inspections | 2× gas turbines | LM5000, MicroNet | Offshore UK |
| Nov 2025 | Commissioning, start-up, mapping | 1× gas turbine | LM6000 PF, MicroNet | UK |
| May–Jul 2025 | Commissioning, production support | 2× gas turbines | LM2500, MicroNet | Offshore Norway |
| Jan 2025 | Troubleshooting | 1× gas turbine | LM5000, MicroNet | Offshore UK |
| Dec 2024 | 4k inspection, instrumentation | 1× gas turbine | LM5000, MicroNet | Offshore UK |
| Period | Work | Equipment | Systems | Location |
|---|---|---|---|---|
| Nov–Dec 2024 | Troubleshooting | 1× gas turbine | LM2500, MicroNet | Offshore Denmark |
| Aug 2024 | 4k inspection, instrumentation | 1× gas turbine | LM5000, MicroNet | Offshore UK |
| Jun–Sep 2024 | Installation, commissioning, control TA | 4× gas turbines | FT4000, MicroNet | Israel |
| May 2024 | Supervising annual inspection, control and instrumentation | 1× gas turbine | LM6000, MicroNet | UK |
| Apr–May 2024 | Package inspections, instrumentation | 2× gas turbines | LM2500, MicroNet | Offshore UK |
| Mar–Apr 2024 | 8k inspection, instrumentation | 1× gas turbine | LM2500, MicroNet | Offshore UK |
| Mar 2024 | Start-up support after fuel metering valve exchange | 1× gas turbine | LM5000, MicroNet | Offshore UK |
| Jan–Feb 2024 | Installation, commissioning, control TA | 4× gas turbines | FT4000, MicroNet | Israel |
| Dec 2023 | Start-up support | 1× gas turbine | LM5000, MicroNet | Offshore UK |
| Nov 2023 | Commissioning, start-up after GG exchange | 1× gas turbine | LM2500, NetCon 5000 | UK |
| Oct 2023 | Control upgrade commissioning | 1× gas turbine | LM2500, MicroNet | Offshore Norway |
| Sep 2023 | L1 inspection, water wash commissioning, turning gear | 1× gas turbine | LM6000, MicroNet | UK |
| Aug–Sep 2023 | L1 inspection, instrumentation and control | 1× gas turbine | LM6000, MicroNet | Offshore UK, FPSO |
| May–Jun 2023 | L1 inspection, instrumentation and control | 1× gas turbine | LM6000, MicroNet | Offshore UK, FPSO |
| Apr 2023 | Safety-critical instrumentation inspection, start-up after GG installation | 1× gas turbine | LM5000, MicroNet | Offshore UK |
| Feb 2023 | Troubleshooting | 1× gas turbine | LM2500, MicroNet | Offshore UK |
| Dec 2022–Apr 2023 | Commissioning, control upgrade | 3× gas turbines | LM2500, MicroNet Plus | Offshore Norway |
| Nov 2022 | Package instrument inspections | 1× gas turbine | LM2500, MicroNet | Offshore UK |
| Sep 2022 | Dual-fuel calibrations, start-up | 1× gas turbine | LM2500, Atlas | Offshore Denmark |
| Aug 2022 | Semi-annual inspection, fuel valve replacement | 1× gas turbine | LM6000, MicroNet | Offshore UK |
| Aug 2022 | GAP and HMI update, PES implementation | 2× gas turbines | LM5000, MicroNet | Offshore UK |
| May 2022 | 4k inspection, instrumentation | 1× gas turbine | LM5000, MicroNet | Offshore UK |
| Apr 2022 | Troubleshooting, fuel metering valve | 1× gas turbine | LM5000, MicroNet | Offshore UK |
| Feb–Mar 2022 | FAT and commissioning, control upgrade | 2× steam turbines, compressor | MicroNet TMR | Oman |
| Dec 2021–Jan 2022 | Start-up support after engine exchange | 1× gas turbine | LM5000, MicroNet | Offshore UK |
| Jul–Aug 2021 | Commissioning, start-up after GG exchange | 1× gas turbine | LM6000, MicroNet | Offshore UK, FPSO |
| Jan–Feb 2021 | Start-up support after GG exchange, 8k instrumentation inspection | 2× gas turbines | LM5000, MicroNet | Offshore UK |
| Nov 2020 | Cold commissioning | 1× gas turbine | LM2500, MicroNet | Germany |
| Aug–Sep 2020 | Start-up support after turnaround | 1× gas turbine | LM5000, MicroNet | Offshore UK |
| Feb–Mar 2020 | Troubleshooting | 1× gas turbine | LM2500, Atlas | Malaysia |
| Jan 2020 | Commissioning, tuning | 1× steam turbine | MicroNet TMR | Saudi Arabia |
| Oct–Nov 2019 | Troubleshooting, start-up | 2× gas turbines | LM2500, MicroNet | Offshore Nigeria, FPSO |
| May 2019 | Wiring checks, troubleshooting | 1× gas turbine | LM2500, MicroNet | Offshore Norway, FPSO |
| Dec 2018 | Troubleshooting | 1× gas turbine | LM2500, MicroNet | Offshore Norway, FPSO |
| Aug–Sep 2018 | Maintenance, operations support | 6× gas turbines | LM2500, MicroNet | Offshore Nigeria, FPSO |
| Jun 2018 | Start-up support, gas export compressor | 1× gas turbine | LM5000, MicroNet | Offshore UK |
| Apr 2018 | Maintenance, operations support | 6× gas turbines | LM2500, MicroNet | Offshore Nigeria, FPSO |
| Mar 2018 | Control upgrade | 1× gas turbine | LM6000 PD, MicroNet | USA |
| Jan–Feb 2018 | Maintenance, operations support | 6× gas turbines | LM2500, MicroNet | Offshore Nigeria, FPSO |
| May–Jul 2017 | Commissioning | 4× gas turbines | TM2500, MicroNet | Argentina |
| Mar–Apr 2017 | Field service | 1× gas turbine | LM2500+G4, MicroNet | Offshore UK, FPSO |
| Feb–Mar 2017 | 8k service, controls support | 1× gas turbine | LM5000, MicroNet Plus | Offshore UK |
| Feb 2017 | Start-up commissioning, dual fuel | 1× gas turbine | LM5000, MicroNet Plus | Offshore UK |
| Oct–Dec 2016 | Commissioning | 2× gas turbines | TM2500, MicroNet | Saudi Arabia |
| Aug–Oct 2016 | Start-up support, gas export compressors | 2× gas turbines | LM5000, MicroNet Plus | Offshore UK |
| May–Jul 2016 | Modification | 2× gas turbines | TM2500, MicroNet | Saudi Arabia |
| Apr–May 2016 | Commissioning, control TA | Gas turbines | LM6000, MicroNet | Egypt |
| Jul 2015–Mar 2016 | Commissioning, balance of plant | 5× gas turbines | TM2500, MicroNet | Saudi Arabia |
| May–Jun 2015 | Commissioning, control TA | 12× gas turbines | LM6000, TM2500, MicroNet | Egypt |
| May 2015 | Troubleshooting, fuel transfer tuning, software updates | 1× gas turbine | LM2500, MicroNet | Offshore Norway |
| Nov 2014 | Water injection, NOx reduction support | 1× gas turbine | LM2500, MicroNet | Offshore Norway |
| Oct–Nov 2014 | Field service | 1× gas turbine | LM1600, MicroNet | Offshore Norway |
| Sep 2014 | Water injection, NOx reduction support | 1× gas turbine | LM2500, MicroNet | Offshore Norway |
| Jun–Jul 2014 | Commissioning | 3× gas turbines | TM2500, MicroNet | Algeria |
| Mar 2014 | Field service | 1× gas turbine | LM2500, MicroNet | Offshore Norway |
| Dec 2013 | Commissioning | 1× steam turbine | MicroNet Plus, ProTech GII | Egypt |
| Oct–Nov 2013 | GAP update, voltage controller tuning | 4× diesel generators, rig | MicroNet | Offshore Egypt |
| Oct 2013 | Field service | 1× gas turbine | LM1600, MicroNet | Offshore Norway |
| May–Sep 2013 | Installation and commissioning | 12× gas turbines | TM2500, MicroNet | Algeria |
| Mar 2013 | HMI and GAP changes, datalogging | 1× gas turbine | LM1600, MicroNet | Netherlands |
| Feb–Apr 2013 | HMI training, MicroNet upgrade commissioning | Turbine controls | MicroNet, iFix | Saudi Arabia |
| Feb–Mar 2013 | Modbus and simulation support | Turbine controls | MicroNet, NetSim | Norway |
| Apr–Nov 2012 | Installation and commissioning | Gas turbines | TM2500, MicroNet | Algeria |
Both. Woodward is one of the companies we are a registered supplier to, and much of our MicroNet work is for OEMs, packagers and service providers, as their field engineer. We also work directly for operators. Where a service contract is in place, we work alongside that team, not around it.
Yes. Logic, sequence and alarm changes in GAP, tested offline before they go onto the running unit. Where the application belongs to the OEM or the packager, we work with their approval and keep to their version control.
Both, and the simplex MicroNet, NetCon 5000 and Atlas systems before them. A redundant or TMR system needs different checks from a simplex one: a failure does not trip the unit, so it has to be found before the second one does.
Hard-to-find and obsolete control and instrumentation parts for MicroNet-controlled packages, sourced through our supplier network, checked for compatibility, installed and tested on site.
Send the start date, location and scope and you get availability and an estimate the same working day. Offshore certificates (OPITO BOSIET/FOET, MIST, offshore medical) are kept current, so paperwork is not what holds you up.
Yes. For campaigns or several units at once we add contractors from our own network, under our agreement, our insurance and our reporting. How resource supply works.
Send the start date, estimated duration, scope, systems on site and location. You get availability and an estimate the same working day.
Request availabilityQuestion from purchasing or compliance? Company details, insurance, HSE and quality policies and procedures are on the Working with Telic page.