4k and 8k inspections
The controls and instrumentation scope of 4k and 8k inspections. Calibration sheets and a service report before we leave the installation.
Telic Engineering / Engines / LM5000
The LM5000 is out of production, but the units that run are expected to keep running, and engineers who know them are getting harder to find. Inspections, safety-critical instrumentation, start-up after an exchange, troubleshooting and GAP updates, offshore, on Woodward MicroNet.
The six places on the LM5000 where most of our work happens, numbered as in the drawing at the top of the page.
By engineers who have done it before. Every job comes with a short daily report and paperwork you can use.
The controls and instrumentation scope of 4k and 8k inspections. Calibration sheets and a service report before we leave the installation.
Inspection and testing of the safety-critical instrumentation on the package, with the records your verification scheme asks for.
Gas generator exchange, engine exchange or turnaround: the checks before the first start, the start itself and the run-up to load.
Valve replacement, set-up and start-up support, including dual-fuel units.
Trips and failed starts on an engine that has seen a lot of years. We read the datalogs first and find the cause.
Application changes on MicroNet and the HMI, tested offline before they go on the running unit.
What we have actually worked on. If your LM5000 package is not on it, ask.
Taken from our track record, newest first. No client or site names here; ask and we tell you, under NDA if needed.
| Period | Work | Equipment | Systems | Location |
|---|---|---|---|---|
| Mar–Apr 2026 | 8k inspection, safety-critical instrumentation | 1× gas turbine | LM5000, MicroNet | Offshore UK |
| Dec 2025 | 8k and safety-critical instrumentation inspections | 2× gas turbines | LM5000, MicroNet | Offshore UK |
| Jan 2025 | Troubleshooting | 1× gas turbine | LM5000, MicroNet | Offshore UK |
| Dec 2024 | 4k inspection, instrumentation | 1× gas turbine | LM5000, MicroNet | Offshore UK |
| Aug 2024 | 4k inspection, instrumentation | 1× gas turbine | LM5000, MicroNet | Offshore UK |
| Mar 2024 | Start-up support after fuel metering valve exchange | 1× gas turbine | LM5000, MicroNet | Offshore UK |
| Dec 2023 | Start-up support | 1× gas turbine | LM5000, MicroNet | Offshore UK |
| Apr 2023 | Safety-critical instrumentation inspection, start-up after GG installation | 1× gas turbine | LM5000, MicroNet | Offshore UK |
| Aug 2022 | GAP and HMI update, PES implementation | 2× gas turbines | LM5000, MicroNet | Offshore UK |
| May 2022 | 4k inspection, instrumentation | 1× gas turbine | LM5000, MicroNet | Offshore UK |
| Period | Work | Equipment | Systems | Location |
|---|---|---|---|---|
| Apr 2022 | Troubleshooting, fuel metering valve | 1× gas turbine | LM5000, MicroNet | Offshore UK |
| Dec 2021–Jan 2022 | Start-up support after engine exchange | 1× gas turbine | LM5000, MicroNet | Offshore UK |
| Jan–Feb 2021 | Start-up support after GG exchange, 8k instrumentation inspection | 2× gas turbines | LM5000, MicroNet | Offshore UK |
| Aug–Sep 2020 | Start-up support after turnaround | 1× gas turbine | LM5000, MicroNet | Offshore UK |
| Jun 2018 | Start-up support, gas export compressor | 1× gas turbine | LM5000, MicroNet | Offshore UK |
| Feb–Mar 2017 | 8k service, controls support | 1× gas turbine | LM5000, MicroNet Plus | Offshore UK |
| Feb 2017 | Start-up commissioning, dual fuel | 1× gas turbine | LM5000, MicroNet Plus | Offshore UK |
| Aug–Oct 2016 | Start-up support, gas export compressors | 2× gas turbines | LM5000, MicroNet Plus | Offshore UK |
Both. Much of our LM5000 work is for OEMs, packagers and service providers, as their field engineer. We also work directly for operators and owners. Where an OEM service contract is in place, we work alongside the OEM team, not around it.
Both. We are experts on Woodward and GE control systems. The LM5000 packages we support run Woodward MicroNet and MicroNet Plus.
Yes. Inspection and testing of safety-critical instrumentation on the LM5000 package is a regular part of our 4k and 8k scope offshore.
Send the start date, location and scope and you get availability and an estimate the same working day. Offshore certificates (OPITO BOSIET/FOET, MIST, offshore medical) are kept current, so paperwork is not what holds you up.
Yes. For campaigns or several units at once we add contractors from our own network, under our agreement, our insurance and our reporting. How resource supply works.
Send the start date, estimated duration, scope, systems on site and location. You get availability and an estimate the same working day.
Request availabilityQuestion from purchasing or compliance? Company details, insurance, HSE and quality policies and procedures are on the Working with Telic page.