Commissioning & start-up
New packages and control upgrades: loop checks, functional tests, first fire and load tests. Also the start-up after a gas generator exchange.
Telic Engineering / Engines / LM2500
Commissioning, inspections, troubleshooting and DLE mapping on the LM2500, LM2500+ and LM2500+G4, SAC and DLE, on Woodward and GE control systems. Most of it offshore, on platforms and FPSOs.
The six places on the LM2500 where most of our work happens, numbered as in the drawing at the top of the page.
By engineers who have done it before. Every job comes with a short daily report and paperwork you can use.
New packages and control upgrades: loop checks, functional tests, first fire and load tests. Also the start-up after a gas generator exchange.
The controls and instrumentation scope of 4k, 8k and annual inspections, including safety-critical instrumentation. Calibration sheets and a service report before we leave.
Trips, failed starts, fuel transfer problems, T48/T54 spread, VSV faults. We read the datalogs first and find the cause, rather than swapping parts until it works.
Mapping and combustion optimisation on LM2500 DLE, single and dual fuel, by our own experienced mapping engineers.
NetCon to MicroNet and MicroNet Plus upgrades, commissioned on a running asset within the shutdown window.
Longer campaigns of maintenance and operations support, also on FPSOs with several units running.
What we have actually worked on. If your LM2500 package is not on it, ask.
Taken from our track record, newest first. No client or site names here; ask and we tell you, under NDA if needed.
| Period | Work | Equipment | Systems | Location |
|---|---|---|---|---|
| Aug 2026 | DLE mapping | 1× gas turbine | LM2500 DLE | Offshore Norway |
| May 2026 | 8k inspection, dual-fuel DLE mapping | 1× gas turbine | LM2500 DLE | Offshore Norway, FPSO |
| Mar–Apr 2026 | Pre-commissioning, combustion optimisation | Gas turbines | LM2500 DLE | Offshore Norway, FPSO |
| Jan–Feb 2026 | Annual inspections, DLE mapping | 1× gas turbine | LM2500 DLE, MicroNet | UK |
| Oct 2025 | 8k inspection, safety-critical instrumentation | 1× gas turbine | LM2500+G4, Mark VIe | Offshore UK |
| May–Jul 2025 | Commissioning, production support | 2× gas turbines | LM2500, MicroNet | Offshore Norway |
| Feb–Apr 2025 | 4k inspection, engine exchange support, start-up | 1× gas turbine | LM2500+G4, Mark VI | Offshore UK |
| Nov–Dec 2024 | Troubleshooting | 1× gas turbine | LM2500, MicroNet | Offshore Denmark |
| Oct 2024 | Troubleshooting | 1× gas turbine | LM2500, Mark VIe | France |
| Apr–May 2024 | Package inspections, instrumentation | 2× gas turbines | LM2500, MicroNet | Offshore UK |
| Period | Work | Equipment | Systems | Location |
|---|---|---|---|---|
| Mar–Apr 2024 | 8k inspection, instrumentation | 1× gas turbine | LM2500, MicroNet | Offshore UK |
| Nov 2023 | Commissioning, start-up after GG exchange | 1× gas turbine | LM2500, NetCon 5000 | UK |
| Oct 2023 | Control upgrade commissioning | 1× gas turbine | LM2500, MicroNet | Offshore Norway |
| Aug 2023 | 4k inspection, start-up | 1× gas turbine | LM2500+G4, Mark VI | Offshore UK |
| Jul 2023 | 8k inspection, safety-critical instrumentation, start-up | 1× gas turbine | LM2500+G4, Mark VI | Offshore UK |
| Feb 2023 | Troubleshooting | 1× gas turbine | LM2500, MicroNet | Offshore UK |
| Dec 2022–Apr 2023 | Commissioning, control upgrade | 3× gas turbines | LM2500, MicroNet Plus | Offshore Norway |
| Nov 2022 | Package instrument inspections | 1× gas turbine | LM2500, MicroNet | Offshore UK |
| Sep 2022 | Dual-fuel calibrations, start-up | 1× gas turbine | LM2500, Atlas | Offshore Denmark |
| Jul 2022 | Control health check | 1× gas turbine | LM2500+G4, Mark VIe | Offshore UK |
| Nov 2021 | 4k instrumentation inspection | 1× gas turbine | LM2500+G4, Mark VI | Offshore UK |
| Feb–Apr 2021 | Commissioning fuel metering system, DLE | 2× gas turbines | LM2500 DLE, Flex500, Mark VIe | South Korea |
| Nov 2020 | Cold commissioning | 1× gas turbine | LM2500, MicroNet | Germany |
| Sep–Oct 2020 | 4k inspection, instrumentation | 1× gas turbine | LM2500+G4, Mark VI | Offshore UK |
| Aug 2020 | Troubleshooting | 1× gas turbine | LM2500+G4, Mark VIe | Offshore UK |
| Jun–Oct 2020 | Maintenance, operations support | 3× gas turbines | LM2500+G4, Mark VI | Offshore UK |
| Feb–Mar 2020 | Troubleshooting | 1× gas turbine | LM2500, Atlas | Malaysia |
| Oct–Nov 2019 | Troubleshooting, start-up | 2× gas turbines | LM2500, MicroNet | Offshore Nigeria, FPSO |
| Jul–Aug 2019 | Field service | 1× gas turbine | LM2500+G4, Mark VI | Offshore UK |
| Jun 2019 | Field service | 1× gas turbine | LM2500+G4, Mark VI | Offshore UK |
| May 2019 | Wiring checks, troubleshooting | 1× gas turbine | LM2500, MicroNet | Offshore Norway, FPSO |
| Dec 2018 | Troubleshooting | 1× gas turbine | LM2500, MicroNet | Offshore Norway, FPSO |
| Oct–Nov 2018 | 8k inspection, start-up | 1× gas turbine | LM2500+G4, Mark VI | Offshore UK |
| Aug–Sep 2018 | Maintenance, operations support | 6× gas turbines | LM2500, MicroNet | Offshore Nigeria, FPSO |
| Apr 2018 | Maintenance, operations support | 6× gas turbines | LM2500, MicroNet | Offshore Nigeria, FPSO |
| Jan–Feb 2018 | Maintenance, operations support | 6× gas turbines | LM2500, MicroNet | Offshore Nigeria, FPSO |
| Sep–Dec 2017 | Commissioning manager | 1× gas turbine | LM2500, RX3i | Italy |
| Mar–Apr 2017 | Field service | 1× gas turbine | LM2500+G4, MicroNet | Offshore UK, FPSO |
| May 2015 | Troubleshooting, fuel transfer tuning, software updates | 1× gas turbine | LM2500, MicroNet | Offshore Norway |
| Nov 2014 | Water injection, NOx reduction support | 1× gas turbine | LM2500, MicroNet | Offshore Norway |
| Sep 2014 | Water injection, NOx reduction support | 1× gas turbine | LM2500, MicroNet | Offshore Norway |
| Mar 2014 | Field service | 1× gas turbine | LM2500, MicroNet | Offshore Norway |
Both. Much of our LM2500 work is for OEMs, packagers and service providers, as their field engineer. We also work directly for operators and owners. Where an OEM service contract is in place, we work alongside the OEM team, not around it.
Both. We are experts on Woodward and GE control systems. On the LM2500 that means MicroNet, MicroNet Plus, NetCon and Atlas as well as Mark VI and Mark VIe.
Yes, with our own experienced mapping engineers: mapping after an engine exchange, combustion optimisation and dual-fuel mapping, offshore and onshore.
Hard-to-find and obsolete control and instrumentation parts for LM2500 packages, sourced through our supplier network, checked for compatibility, installed and tested on site.
Send the start date, location and scope and you get availability and an estimate the same working day. Offshore certificates (OPITO BOSIET/FOET, MIST, offshore medical) are kept current, so paperwork is not what holds you up.
Yes. For campaigns or several units at once we add contractors from our own network, under our agreement, our insurance and our reporting. How resource supply works.
Send the start date, estimated duration, scope, systems on site and location. You get availability and an estimate the same working day.
Request availabilityQuestion from purchasing or compliance? Company details, insurance, HSE and quality policies and procedures are on the Working with Telic page.