Troubleshooting
Trips, failed starts, diagnostic alarms, I/O and network faults. Trip history and Trender first, then the wiring, then the parts.
Telic Engineering / Controls / GE Mark VI and Mark VIe
Unit tripped, inspection due, or a start-up after an engine exchange? We troubleshoot, inspect, start up and commission GE Mark VI and Mark VIe on LM2500 and LM2500+G4 packages, offshore and onshore. The engine, its instruments and its protection are what we know inside out; the control system is where we read and prove them.
The six places where most of our work happens, numbered as in the drawing at the top of the page.
By engineers who have done it before. Every job comes with a short daily report and paperwork you can use.
Trips, failed starts, diagnostic alarms, I/O and network faults. Trip history and Trender first, then the wiring, then the parts.
The controls and instrumentation scope of 4k, 8k and annual inspections on Mark VI and Mark VIe units, including safety-critical instrumentation.
Engine or gas generator exchange: the checks before the first start, the start itself and the run-up to load.
Instrument loops, thermocouples, vibration and speed chains checked end to end, with calibration sheets you can file.
New Mark VIe packages and control upgrades: point-to-point checks after the panel work, functional tests, first start and load tests, within the outage window.
Controllers, voting, networks, power supplies and pack diagnostics on a running unit, written up so you know what to fix at the next outage.
What we have actually worked on. If your system is not on it, ask.
| Period | Work | Equipment | Systems | Location |
|---|---|---|---|---|
| Oct 2025 | 8k inspection, safety-critical instrumentation | 1× gas turbine | LM2500+G4, Mark VIe | Offshore UK |
| Feb–Apr 2025 | 4k inspection, engine exchange support, start-up | 1× gas turbine | LM2500+G4, Mark VI | Offshore UK |
| Oct 2024 | Troubleshooting | 1× gas turbine | LM2500, Mark VIe | France |
| Aug 2023 | 4k inspection, start-up | 1× gas turbine | LM2500+G4, Mark VI | Offshore UK |
| Jul 2023 | 8k inspection, safety-critical instrumentation, start-up | 1× gas turbine | LM2500+G4, Mark VI | Offshore UK |
| Jul 2022 | Control health check | 1× gas turbine | LM2500+G4, Mark VIe | Offshore UK |
| Nov 2021 | 4k instrumentation inspection | 1× gas turbine | LM2500+G4, Mark VI | Offshore UK |
| Feb–Apr 2021 | Commissioning fuel metering system, DLE | 2× gas turbines | LM2500 DLE, Flex500, Mark VIe | South Korea |
| Sep–Oct 2020 | 4k inspection, instrumentation | 1× gas turbine | LM2500+G4, Mark VI | Offshore UK |
| Aug 2020 | Troubleshooting | 1× gas turbine | LM2500+G4, Mark VIe | Offshore UK |
| Period | Work | Equipment | Systems | Location |
|---|---|---|---|---|
| Jun–Oct 2020 | Maintenance, operations support | 3× gas turbines | LM2500+G4, Mark VI | Offshore UK |
| Jan–Apr 2020 | Commissioning | 5× gas turbines | TM2500, RX3i | Ghana |
| Jul–Aug 2019 | Field service | 1× gas turbine | LM2500+G4, Mark VI | Offshore UK |
| Jun 2019 | Field service | 1× gas turbine | LM2500+G4, Mark VI | Offshore UK |
| Oct–Nov 2018 | 8k inspection, start-up | 1× gas turbine | LM2500+G4, Mark VI | Offshore UK |
| Sep–Dec 2017 | Commissioning manager | 1× gas turbine | LM2500, RX3i | Italy |
Both. GE Vernova is one of the companies we are registered with as a supplier, and much of our Mark VI and Mark VIe work is for OEMs, packagers and service providers, as their field engineer. We also work directly for operators, alongside the OEM team where a service contract is in place.
Less than people think. We are experts on Woodward and GE control systems, and on an LM2500 the engine, the instruments and the protection are the same whichever control runs them; the platform is where you read and prove them. Our track record has Mark VI and Mark VIe jobs every year from 2018 to 2025, next to the Woodward work.
Yes. Point-to-point checks after the panel work, functional tests of every sequence and trip, first start and load test, planned so it fits the outage.
Hard-to-find and obsolete control and instrumentation parts for Mark VI and Mark VIe packages, sourced through our supplier network, checked for compatibility, installed and tested on site.
Send the start date, location and scope and you get availability and an estimate the same working day. Offshore certificates (OPITO BOSIET/FOET, MIST, offshore medical) are kept current, so paperwork is not what holds you up.
Yes. For campaigns or several units at once we add contractors from our own network, under our agreement, our insurance and our reporting. How resource supply works.
Send the start date, estimated duration, scope, systems on site and location. You get availability and an estimate the same working day.