Troubleshooting
Trips, hunting, valves that do not follow demand. Event log and trend first, then the valve, then the wiring.
Telic Engineering / Controls / Woodward 505, 5009 and ProTech
A steam turbine that hunts, trips or will not hold extraction pressure, an overspeed test your insurer wants proven, or a generator that will not synchronise? We commission, tune and troubleshoot Woodward steam turbine governors and overspeed protection, compressor drives and generator controls. Single valve or extraction and admission, simplex or fault-tolerant, offshore and onshore.
The six places where most of our work happens, numbered as in the drawing at the top of the page.
By engineers who have done it before. Every job comes with a short daily report and paperwork you can use.
Trips, hunting, valves that do not follow demand. Event log and trend first, then the valve, then the wiring.
Speed, load and extraction loops tuned on the running machine, so it holds steady when the process does not.
New governors and protection systems: I/O checks, valve calibration, overspeed trip tests, first roll and load tests.
Control upgrades on steam turbine and compressor trains, from the factory acceptance test to commissioning, and GAP updates with the site acceptance test that proves them.
easYgen and LS-6 on generator sets and turbine generators: synchronising, load sharing, breaker control and the power management that ties them together.
Woodward 723 and EPG governors on diesel generators: load bank tests and troubleshooting.
What we have actually worked on. If your system is not on it, ask.
| Period | Work | Equipment | Systems | Location |
|---|---|---|---|---|
| Jun–Aug 2026 | Commissioning, power management | Turbine generator, PMS | MicroNet/GAP, Flex500, easYgen, LS-6 | Egypt |
| Feb–Mar 2022 | FAT and commissioning, control upgrade | 2× steam turbines, compressor | MicroNet TMR | Oman |
| Nov 2021–Feb 2022 | Troubleshooting | 1× diesel generator | EPG governor | Offshore Qatar |
| Jan 2020 | Commissioning, tuning | 1× steam turbine | MicroNet TMR | Saudi Arabia |
| Apr 2019 | Commissioning | 1× steam turbine, compressor | Peak 200 | Bahrain |
| Jan–May 2019 | Commissioning, three trips | 1× steam turbine, compressor | 5009FT | Offshore Australia, FLNG |
| Oct 2014 | Start-up engineer | Steam turbine, condenser | – | France |
| Apr–Jun 2014 | Engineering, commissioning | Power management system, vessel | Atlas II | Netherlands, West Africa |
| Feb–Mar 2014 | Load bank tests | 6× diesel generators, vessel | 723+ | Netherlands |
| Dec 2013 | Commissioning | 1× steam turbine | MicroNet Plus, ProTech GII | Egypt |
| Period | Work | Equipment | Systems | Location |
|---|---|---|---|---|
| May 2013 | GAP update, site acceptance tests | 2× steam turbines | 505DE | Algeria |
| Apr 2012 | Tuning | Steam turbine | 505, ProTech | Oman |
Yes. Steam turbine governors and overspeed protection are part of our work: single valve and extraction or admission machines, driving generators and compressors, offshore and onshore.
Yes. On a ProTech each module can be tested with a simulated speed signal, so the trip function is proved without running the turbine to trip speed. Where your procedure or your insurer asks for a real overspeed test, we do that too.
Yes. easYgen and LS-6 on generator sets and turbine generators, and the power management system around them, most recently on a turbine generator project in Egypt.
Hard-to-find and obsolete control and instrumentation parts for steam turbine, compressor and generator controls, sourced through our supplier network, checked for compatibility, installed and tested on site.
Send the start date, location and scope and you get availability and an estimate the same working day. Offshore certificates (OPITO BOSIET/FOET, MIST, offshore medical) are kept current, so paperwork is not what holds you up.
Yes. For campaigns or several units at once we add contractors from our own network, under our agreement, our insurance and our reporting. How resource supply works.
Send the start date, estimated duration, scope, systems on site and location. You get availability and an estimate the same working day.
Request availabilityQuestion from purchasing or compliance? Company details, insurance, HSE and quality policies and procedures are on the Working with Telic page.