Annual and L1 inspections
The controls and instrumentation scope of annual, semi-annual and L1 inspections, on FPSOs and onshore. Calibration sheets and a service report before we leave.
Telic Engineering / Engines / LM6000
Commissioning, annual and L1 inspections, start-up after a gas generator exchange, control upgrades and mapping on the LM6000. Power plants onshore and power generation on FPSOs, on Woodward and GE control systems.
The six places on the LM6000 where most of our work happens, numbered as in the drawing at the top of the page.
By engineers who have done it before. Every job comes with a short daily report and paperwork you can use.
The controls and instrumentation scope of annual, semi-annual and L1 inspections, on FPSOs and onshore. Calibration sheets and a service report before we leave.
Trips, failed starts, fuel valve faults, temperature spread. We read the datalogs first and find the cause.
New units and the start-up after a gas generator exchange, including mapping on the LM6000 PF.
Your inspection crew, our engineer on the controls and instrumentation side: supervising, testing and signing off.
Migrations to MicroNet Plus or Mark VIe, HMI replacement and the commissioning that goes with it.
On multi-unit projects: an engineer who knows the control system inside out, next to the installation contractor.
What we have actually worked on. If your LM6000 package is not on it, ask.
| Period | Work | Equipment | Systems | Location |
|---|---|---|---|---|
| Feb–Mar 2026 | Annual inspections, functional checks | 2× gas turbines | LM6000, MicroNet | Offshore UK, FPSO |
| Jan–Feb 2026 | Annual inspections, functional checks | 2× gas turbines | LM6000, MicroNet | Offshore UK, FPSO |
| Nov 2025 | Commissioning, start-up, mapping | 1× gas turbine | LM6000 PF, MicroNet | UK |
| May 2024 | Supervising annual inspection, control and instrumentation | 1× gas turbine | LM6000, MicroNet | UK |
| Sep 2023 | L1 inspection, water wash commissioning, turning gear | 1× gas turbine | LM6000, MicroNet | UK |
| Aug–Sep 2023 | L1 inspection, instrumentation and control | 1× gas turbine | LM6000, MicroNet | Offshore UK, FPSO |
| May–Jun 2023 | L1 inspection, instrumentation and control | 1× gas turbine | LM6000, MicroNet | Offshore UK, FPSO |
| Aug 2022 | Semi-annual inspection, fuel valve replacement | 1× gas turbine | LM6000, MicroNet | Offshore UK |
| Jul–Aug 2021 | Commissioning, start-up after GG exchange | 1× gas turbine | LM6000, MicroNet | Offshore UK, FPSO |
| Oct 2020 | Borescope inspection | 1× gas turbine | LM6000 PF | UK |
| Period | Work | Equipment | Systems | Location |
|---|---|---|---|---|
| Mar 2018 | Control upgrade | 1× gas turbine | LM6000 PD, MicroNet | USA |
| Apr–May 2016 | Commissioning, control TA | Gas turbines | LM6000, MicroNet | Egypt |
| May–Jun 2015 | Commissioning, control TA | 12× gas turbines | LM6000, TM2500, MicroNet | Egypt |
| Nov–Dec 2012 | Commissioning support | 2× gas turbines | LM6000 | Italy |
| Aug–Sep 2011 | Package testing and commissioning | 3× gas turbines | LM6000 PD and PC, MicroNet Plus | Hungary |
| Aug 2011 | Package test support | 1× gas turbine | LM6000 PC, MicroNet Plus | Hungary |
| Apr 2009–Sep 2010 | Commissioning, start-up, performance test | 1× gas turbine | LM6000 PD, MicroNet | Belgium |
| Sep 2008–Jan 2009 | Commissioning, instrumentation and control | 3× gas turbines | LM6000 PC and PD, MicroNet | Turkey |
| Jul–Aug 2008 | Package test support, first fire | 1× gas turbine | LM6000 DLE, MicroNet | Hungary |
Both. Much of our LM6000 work is for OEMs, packagers and service providers, as their field engineer. We also work directly for operators and owners. Where an OEM service contract is in place, we work alongside the OEM team, not around it.
Both. We are experts on Woodward and GE control systems: Woodward MicroNet, MicroNet Plus and NetCon, and GE Mark VI and Mark VIe.
Hard-to-find and obsolete control and instrumentation parts for LM6000 packages, sourced through our supplier network, checked for compatibility, installed and tested on site.
Send the start date, location and scope and you get availability and an estimate the same working day. Offshore certificates (OPITO BOSIET/FOET, MIST, offshore medical) are kept current, so paperwork is not what holds you up.
Yes. For campaigns or several units at once we add contractors from our own network, under our agreement, our insurance and our reporting. How resource supply works.
Send the start date, estimated duration, scope, systems on site and location. You get availability and an estimate the same working day.
Request availabilityQuestion from purchasing or compliance? Company details, insurance, HSE and quality policies and procedures are on the Working with Telic page.