Telic Engineering / Field notes / Week 48

Safety rules

Week 48Remco Petersen

Sheet 48

Field note, first posted on LinkedIn.

No permit, no work. Cutaway of a gas turbine package with every energy source isolated and locked by the site under the client permit: permit on a clipboard, electrical breaker locked in the MCC, fuel gas block valves locked, the site lock box, a laptop with control logic next to a signed change approval, the enclosure door with the fire suppression cylinders inhibited, and a stop sign. Six numbered points. STARTER TURBINE ENCLOSURE FUEL GAS OFF MCC PERMIT SITE LOCK BOX INH FIRE SUPPRESSION CHANGE STOP 01PERMIT FIRSTrisk assessment, toolbox talk 02EVERY SOURCE ISOLATEDfuel, power, oil, air, rotation 03SITE ISOLATIONSchecked before I sign on 04LOGIC CHANGESclient approval, on record 05ENCLOSURE ENTRYper site inhibit procedure 06STOP THE JOBanyone, any time, no blame

No permit, no work. That is where safety on a turbine job starts.

How I work on every Telic assignment:

  1. 1.Permit first. No work starts without the site permit, risk assessment and toolbox talk.
  2. 2.Every source isolated as the job requires. Electrical, fuel gas, liquid fuel, hydraulic, lube oil, air, rotation, heat and fire suppression.
  3. 3.Isolations by the site. The site's isolation authority isolates and locks. I go through the isolation list before I sign on.
  4. 4.No change to logic or settings without the client's written approval and a record.
  5. 5.Enclosure entry only with the site's fire suppression and gas detection inhibit procedure.
  6. 6.Stop the job. Anyone on site can, any time, no blame.

Where client and Telic rules differ, the strictest applies.

Which part of the permit do you always check twice?

Shutdown or engine exchange coming up and you need a controls engineer who works this way? Send me a message, happy to support.

Send the start date, estimated duration, scope, systems on site and location. You get availability and an estimate the same working day.

Request availability

Question from purchasing or compliance? Company details, insurance, HSE and quality policies and procedures are on the Working with Telic page.

Remco Petersen
Telic Engineering B.V.
Markenplein 24, 1011 MV Amsterdam
The Netherlands
remco.petersen@telic-engineering.nl
+31 6 51345316
Telic Engineering on LinkedIn
Remco Petersen on LinkedIn