No permit, no work. That is where safety on a turbine job starts.
How I work on every Telic assignment:
- 1.Permit first. No work starts without the site permit, risk assessment and toolbox talk.
- 2.Every source isolated as the job requires. Electrical, fuel gas, liquid fuel, hydraulic, lube oil, air, rotation, heat and fire suppression.
- 3.Isolations by the site. The site's isolation authority isolates and locks. I go through the isolation list before I sign on.
- 4.No change to logic or settings without the client's written approval and a record.
- 5.Enclosure entry only with the site's fire suppression and gas detection inhibit procedure.
- 6.Stop the job. Anyone on site can, any time, no blame.
Where client and Telic rules differ, the strictest applies.